Shanghai Industrial Boiler Co., Ltd./Shanghai industrial boiler (Wuxi) Co., Ltd.
Solution·Application area
Glass industry
The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.

2018/08/16 14:44:43

16148

Prev Next
×
主站蜘蛛池模板: 天堂精品视频一区二区在线观看 | 91手机看片国产永久免费 | 一级黄色片 | 亚洲丁香色婷婷综合欲色啪 | 国产亚洲产品影市在线产品 | 欧美日韩精品二区 | 国产v亚洲v天堂无码网站 | 久久国产精品婷婷综合一区 | 国产小视频免费在线观看 | 国产精品不久影院 | 日本高清在线播放一区二区三区 | 国产精品美女流白浆视频 | 国产一区二区精品久久麻豆 | 国产a一区二区三区香蕉小说 | 麻豆精品一区二正一三区 | 精品久久人人爽天天玩人人妻 | 精品久久蜜芽尤物TV | 天美传媒新剧国产网站 | 亚洲欧美天堂综合一区 | 777亚洲熟妇自拍无码区 | 亚洲日韩aⅴ在线视频 | 一日本一区二区三区高清视 | 日韩av免费专区 | 五月丁香综合网站婷婷 | 亚洲日韩国产一区二区三区 | 东京热无码人妻一区二区三区av | 亚洲国产一区二区在线 | 漂亮少妇高潮A片XXXX | 国产做a爱免费视频在线 | 粗大猛烈进出高潮视频大全 | 国产一区二区女内射 | 亚洲免费视频日本一区二区 | 色网址导航大全 | 激情欧美乱妇 | 国产欧美另类精品又又久久 | 日本色视频成人免费 | 91精品啪在线看国产网站 | 国产91精品久久二区二区 | 久久精品国产国产毛片 | 东京热av一区二区 | 2024国内精品久久久久影院 |