亚洲肥老太bbw中国熟女-亚洲二区在线视频-亚洲二区在线观看-亚洲二区精品婷婷久久精品-亚洲都市校园激情另类-亚洲动作一

Welcome to the official website of Shanghai Industrial Boiler Co., Ltd. / Shanghai Industrial Boiler (Wuxi) Co., Ltd.

Home
TEL:0510-88787772
Application areaEngineering generalcontractor Boiler modificationEquipment installation

Glass industry



The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
    

 

    
Glass kiln waste heat power generation process flow chart

The dry quenching technique utilizes a cold inert gas (combusted exhaust gas) to exchange heat with red hot red coke in a dry quenching furnace to cool the red coke. The inert gas that absorbs the heat of the red coke transfers the heat to the dry quenching boiler to generate steam, and the cooled inert gas is then circulated by the circulating fan into the dry extinguishing furnace to cool the red coke. The steam generated by the CDQ boiler is either incorporated into the steam pipe network of the plant or sent to generate electricity. In the reverse movement, the coke is gradually cooled to below 250 ° C, and then discharged by the unloading device at the bottom of the furnace; at the same time, the inert gas (or waste flue gas) is heated to about 800 ° C, passing through the dry quenching ramp After the primary dust collector, the boiler enters the dry quenching boiler; in the boiler, the water is heated by the hot air stream to generate steam, and the gas is cooled to about 200 ° C, and then re-supplied into the dry extinguishing furnace by the circulating fan through the secondary dust removal.
2018/08/16 14:44:43 16141

Related documents

Copy right ? 2018 Shanghai Industrial Boiler Co., Ltd.

Record number: Su ICP No. 18041342

主站蜘蛛池模板: 国产粉嫩一区二区三区网站 | 成人片在线观看视频 | 东京热无码专区 | 丁香狠狠色婷婷久久综合亚洲日本一区二区 | 色一欲一性一乱一区二区三区 | 一区二区三区免费视频网站 | 一区二区免费在线观看 | 久久久久无码国产精品一区中文字幕 | 国产91丝袜在线播放动漫蜜月 | 国产精品日本欧美一区二区 | 国产精品高潮呻吟久久v无码 | 丰满少妇熟妇乱偷人无码 | 丝袜人妻一区二区三区网站 | 在线观看不卡AV | 久久精品国产亚洲a不不卡 久久精品国产亚洲v高清色欲 | 亚洲欧洲∨国产一区二区三区 | 亚洲欧美视频国内自拍 | 麻豆人妻少妇精品无码专 | 2024久久久最新欧美 | 91精品欧美综合在线野草社区 | 久久中文字幕人妻丝袜 | 久久人妻一区二区三区1024 | 国产激情一区二区三区在线hd | 国产卡二卡三卡四卡免费网址 | 久久久久久久精品国产 | 精品久久一区精品久久 | 无码av啪啪一区二区三区 | 欧美人妻精品一区二区三区 | 日韩精品无码一区二区三区电影院 | 在线亚洲AV成人无码一区小说 | 欧美亚洲另类图片一区二区 | 国产成人无码精品久久99 | 国产专区自拍三级 | 久久综合久久综合久久综合 | 五月天婷婷天天综合入口 | 麻豆精品一区二正一三区 | 欧美精品亚洲精品日韩专区 | 日本免费一区二区三区四区五六区 | 国产精品久久精品第一页不卡 | 国产亚洲日本人在线观看 | 加勒比综合久久一区二区 |